Kinder Morgan Trident Meter Station

The Trident pipeline is a $1.8 billion dollar 219 mile natural gas pipeline to transport 2 billion cubic feet per day from Katy TX to the Port Arthur LNG export facility. USH was awarded and installed over 400 piles for a meter station outside Port Arthur LNG. The piles were installed to 80-90′ below grade to support various piping and skidded equipment. The project was completed on time and ahead of schedule.
Afton Chemical

USH was contacted to provide an engineered design for helical piles in lieu of auger cast piles at this Chemical Plant. The helical piles were to support a failing rail bridge crossing inside the facility due to settlement of the existing deep foundation support. (16) 4.5” leads that transitioned to 8-5/8” diameter extensions 40’ in depth were installed safely and on schedule.