Our FOUNDATION Services
We offer helical piles for all types of new construction ranging from residential to commercial, oil & gas to municipalities, custom pools, decks, retaining walls, bridges, and more.
What We Do
TURNKEY Engineered SOLUTIONS
All of our helical solutions are engineered for optimal performance and reliability.
MANUFACTURINg & DISTRIBUTION
We can provide load calculations, foundation design, and quotes to fit your needs.
installation
Fast, safe, and secure helical pile installation.
Get A Quote For Your Project
TURNKEY ENGINEERED SOLUTIONS
Need helical pile design? No problem! With our in-house engineering services, we can provide you with a detailed helical pile design prepared by a licensed Professional Engineer. The helical pile design will be customized to your project and the geotechnical investigation report provided. If you don’t have any plans or a geotechnical report, we can help with that, too! We work with a variety of structural engineers and geotechnical firms that can assist with any of these needs beyond our -in-house capacity.
MANUFACTURING & DISTRIBUTION
We offer in-house custom manufacturing capabilities as well as keeping a large stock of inventory for various helical pile products that can be shipped across the country meeting your needs and timelines.
- Custom Helical Pile Products
- Large Stock Inventory
- Competitive Pricing
InSTALLATION
Need it done now? No problem. Our installation team is comprised of trained professionals that have installed piles safely, quickly, and consistently over the past 65 years! The installation procedure for helical piles is drastically more flexible than many common deep foundation options utilized today. There are several complications that commonly arise for many of the deep foundation options used today. These include issues such as groundwater or soils sloughing into drilled shafts. However, these issues won’t affect the installation or performance of screw piles. Additionally, the installation can be completed in significantly less time required by other options such as drilled piers which require about a week after installation for concrete curing prior to placing structures. With screw piles, you can place equipment and structures on them the same day they are installed.
- Highly Trained and Safety Conscious Crews
- Travel Across The Lower 48
- Several Crews To Meet Your Needs
“If you think it’s expensive to hire a professional to do the job, wait until you hire an amateur.”
RED ADAIR